A simulation using charts and documents to help
participants understand the demands of the production process and the reasons
for them. The players take the role of managers required to allocate eight different
types of work between three different machines. All three machines have different
constraints. The exercise is designed for groups of 1-4 members and comes complete
with enough materials for six groups. It will last between 2-3 hours including
discussion time.
OBJECTIVE
The exercise will help players understand the choices involved in managing a production
process, and the reasons for them. It will:
- make them better able to judge the importance
of competing demands and the consequences that will follow from agreeing to them;
- increase their ability to explain the reasons
for their decisions and so win cooperation from those around them.
HOW IT WORKS
The tutor introduces the exercise and distributes the players instructions
and working documents. The main planning document is a bar chart which allows
players to show the hour by hour allocation of three machines between the eight
products that the company makes. All machines can make all products, but they
have to be set-up, and (once set-up) produce at different rates. Players
are given details of existing orders and must allocate them to machines. Once
decisions have been made for Day one, the tutor reveals in-coming orders
for the next day. Players must then decide whether to keep their machines running
on the products for which they are currently set up or whether to re-allocate
them in the light of the new situation. The cycle continues for several days.
The players have to balance the changing requirements of the situation - such
as the need for economic production (long runs), the need for value of throughput
(making profitable articles), and the need to satisfy customers (making orders
in turn). Once sufficient rounds have been completed the players can be asked
to analyse their performance against a variety of suggested measures. For example
time lost to set-ups or orders completed.
WHAT PARTICIPANTS WILL BE DOING
Studying the rules and then making judgments about the priority to be given to
various orders placed by customers. Showing their decisions by marking off time
slots on a machine allocation chart.
FOR WHAT LEVELS IS IT APPROPRIATE?
Supervisors; Junior and Middle managers; Students of business and management.
INCLUDED
Tutor manual; Players instructions; Post exercise questionnaire and all
supporting documentation.
COST
£165 plus Vat and delivery.
|